Knowledge / Technical topic

Production/test processes

Not started

Self-directed study

Repeatable test procedures and verification for hardware in production.

Practice in the Flight Lab: Pick the verification method · Close the procedure · Call the TRR

Subareas

Test procedures & pass/fail criteriaFault injectionAutomated test reportsVerification matricesEnvironmental testing (TVAC, EMI/C, vibration)Lab instruments: oscilloscope, DMM, logic analyzer

What to learn

  • SE Handbook verification sections
  • Build the mini HIL bench (project 4)

Resources

← All knowledge